02 How I work
How one person runs six.
Two gates before the build. One more before it goes out.
The line
Nine steps. Three gates.
Six steps move the work along. Three gates can stop it.
-
Orchestrator
Step
Splits the job into clear steps and gives each step to the right agent.
-
Prototyper
Step
Builds a quick first version, to see it before anything is built for real.
-
Demand gate
Gate
Checks that somebody really needs it. If nobody does, the job stops here.
-
Bench gate
Gate
All five seats attack the plan before the real work starts. Every seat must agree.
Checked by all five seats of the bench.
-
Builder
Step
Makes the real thing: research, code, words, pictures. This page was made that way.
-
Sweeper gate
Gate
Checks every claim against its source. A claim that fails holds the launch.
Checked by seat 04, Inspector.
-
Grower
Step
What shows demand gets more time. The rest waits its turn.
Checked by seat 03, Rival.
-
Maintainer
Step
Keeps it running, up to date and inside its cost.
Checked by seat 02, Actuary.
-
Harmony
Step
Checks that the problem is really solved, in numbers, and that it stays solved.
Checked by seat 05, Problem solved.
The bench
Five seats.
The five seats do not build. They try to break what was built.
- 01
Prosecutor
Looks for everything that could go wrong.
- 02
Actuary
Checks the cost and the risk.
- 03
Rival
Asks how a competitor would beat it.
- 04
Inspector
Checks the quality of every detail.
- 05
Problem solved
Checks that the problem is really gone, not just worked on.
Work together
Have a project? Let’s build it together.
Tell me what your business needs. One message is enough to start.